The Queensferry Crossing across the Forth Seminar08/11/16

Join us for an evening seminar at Teeside University regarding the Queensferry Crossing by its Project Manager Lawrence Shackman for Transport for Scotland.

In 2015 Lawrence presented a paper on the early works in Newcastle. Since then there have been major works and advances in construction. The talk will give details of construction of the 2.7km structure, which has the longest 3-tower cable-stay spans. Items likely to be covered include:
1. Corrosion of Forth Rd Br cables leading to the need for the new bridge.
2. Caisson design and construction.
3. Piers
4. Cable spinning
5. Precasting of decks
6. Lifting of deck segments into position
All engineers and students will find great interest in one of the major structures of our time.

For more information on this event please contact Joe Foley at Joe@Structural.org.uk.

 

Organisation: CIHT
Date: 08/11/16
Time: 5:45
Speaker: Lawrence Shackman
Venue: Teeside University (Stephenson Building Lecture Theatre)
Cost: Free
Type: Evening Seminar
Contact: joe@structural.org.uk
Region: Tees Valley: Tees Valley
Time of Day: Evening
Topic: Transport


Notice: Trying to access array offset on value of type null in /home/sites/www.cicne.co.uk/web/wp-content/plugins/sem-author-image/sem-author-image.php on line 774
Posted on